Structural Design for Corridor II of Hyderabad Metro
(from Jubilee Bus Stand (JBS) to Falaknuma), Hyderabad, India

Salient Features:

M/s Pragati Consultants associated L&T Ramboll Consulting Engineers Limited in the detailed design services of the Viaduct for Corridor II.


The Scope of the Project is as given below:

  Mr. Anjaneyulu was appointed as the Team Leader- L&T Ramboll.

  M/s Pragati Consultants deputed senior bridge engineer & senior draughtsmen for carrying out detailed designs of typical Superstructure and substructures.

  Team Leader led a team consisting of L&T Ramboll & Pragati Consultants to carry out entire scope of work to be performed by L&T Ramboll under agreement with HMRL.

flyover2

Elevated Bangalore - Hosur Expressway on
NH- (Between Silk Board Junction to Electronic city), Bangalore, India

Salient Features:

This is a BOT project for a consortium of contractors comprising of M/s.Nagarjuna Constructions, Mytas Infra and SOMA enterprises.

The Cost of the project is around 450 Crores.

The Scope of the Project is as given below:

  Construction of RCC Drain on both side of the carriageway

  Widening of the existing main carriageway from 4 Lane to 6 Lane     standards.

  Widening of Service road to 2 Lane with 2.5 m shoulder.

  Construction of approach Ramp with Reinforced earth wall of width    16.4 m from Km 9.509 to Km 9.681

  Construction of 4 Lane Elevated Corridor with Precast Segmental     construction from • Km 9.681 to Km 17.735 (8.045 Km)

  Construction of Interchange at Electronic City consisting of RCC     curved voided slabs and Precast girders with in-situ deck slab.

  Widening of existing cross drainage structures.

  Construction of Pedestrian subways at four locations with Box pushing      method..
Salient Features:

Owner: Greater Hyderabad Municipal Corporation, India. .

Construction Agency:  JMC Projects (India) Pvt Ltd  .

Construction Cost : Rs. 19 Crores.

The total length of the flyover is around 870 m length including 1 Nos. of Obligatory span sigle cell cast insitu curved PSC box girder of span 40.0m Viaduct spans consists of 3/4 span continuous precast PSC girders with insitu deck slab..

Salient Features:

Entrepreneur: Maharashtra State Road Development Corp.

Construction Agency:  Nagarjuna Construction Company Limited - ECCI Limited Joint Venture, Hyderabad, India.

Construction Cost : Rs. 42Crores.

This is a six-lane flyover of length 1427.00 meters and width 24.20 meters. The length of the viaduct portion of the flyover is 1127.00 meters comprising of 400 numbers of post-tensioned I-girders and having 50 spans (ten five-span continuous segments) of 20 meters each and two two-span cast-in-situ prestressed concrete continuous box girders spanning 44.00 - 27.00 meters at Kalina and Vakola junctions.

We submitted the designs and drawings in a phased manner enabling the contractor to complete the project three months ahead of schedule.

Salient Features:

Entrepreneur: Maharashtra State Road Development Corp.

Construction Agency:  Nagarjuna Construction Company Limited - ECCI Limited Joint Venture, Hyderabad, India.

Construction Cost : Rs. 18Crores.

The flyover is of 460 m length including 1 Nos. of Obligatory span twin cell cast insitu curved PSC box girder of span 37.0m Viaduct spans consists of 3 span continuous twin cell PSC box girder catering to 3 lane carriageway of 11.0 m width.

The substructure consists of single pier with a cantilever pier cap and open foundations.

This project also consists of a 100 m length closed subway with 200 m open subway on either side in effect giving rise to a three level interchange at the junction..

Salient Features:

This is a BOT project for M/s. M .V.R. Infrastructure and Tollways Pvt. Ltd.

The construction package for the project includes developing the existing two lane carriageway to four I six lane divided carriageway standards.

The entire stretch of the projects include 4 Nos. Flyovers, 1 Nos.. Road over bridge, 14 Nos. Minor bridges, 48 Nos. CD structures and 8 Nos. Pedestrian underpass.

Salient Features:

This is a project for M/s. Lanco Infratech. Ltd.

Design of High level bridge across river Narmada as part of MP state road sector development project , Phase II between Chabi to Shapura road. This 2 Lane bridge consists of 8 spans of 30 m resting on hammer head piers and box type abutment. The cost of the bridge 100 crores.

Please click on the link below to see a comprehensive list of all the other bridge / flyover
projects completed by PRAGATI CONSULTANTS

LIST OF BRIDGE PROJECTS